Specialized Hydraulic Equipment

Innovative products designed to meet the toughest challenges in heavy load moving. From precise rotation and accurate load placement to awkward, oversized, and fragile loads, we have equipment for every job.

Jacking Load Shoes

Our JLS250 Jacking Load Shoes are load-compensating skid shoes designed to complement our Heavy Track skidding systems. Any number of shoes can be connected together to increase the total load capacity while maintaining equal load support and weight distribution.

Powered Turntables

Our engineered Turntables are an extremely simple and low-maintenance means of rotating any heavy or oversized load accurately and efficiently, even in areas of restricted access or clearance.

Alignment Shoes

The AS150 and AS500 Alignment Shoe systems make final precise positioning of a load simple and accurate. Each component is hand-portable for simple transportation, set-up, and mobilization with minimal personnel and effort.

Climbing Jacks

Hydra-Jack™ Climbing Jacks incorporate a hydraulic cylinder  inside a specially designed load casing. As the jacks are extended and retracted, block piles can be progressively built under each jack to easily and safely raise and lower large loads or structures.

How to Buy

Information on product purchasing, lead time, shipping, and more.

Call Us

+1-519-900-1450

Send a Message

The Hydra-Slide staff and products are second to none. The system and support have been, and continue to be, well over our expectations, and we could not be happier."
A Hydra-Slide HT500 skidding system and TT500 turntable combined to provide an effective alternative to a crane as heavy transport and rigging firm Dynamic Specialized replaced a transformer at a facility in Northern Virginia. The scope of work covered the removal and relocation of the old transformer, followed by positioning of a larger transformer on the vacated foundation. The HT500 was employed to slide the loads, while the turntable rotated the larger transformer 90 degrees—all while leaving the transformer fully dressed. The transformer was originally scheduled to be disassembled, drained, and have all of its bushings removed in order to be moved by crane. It was decided that the heavier transformer could be skidded fully dressed from its storage location to its final pad and rotated via turntable to create clearance for the radiators. This method shaved several days off the original schedule, as the unit did not have to be disassembled or reassembled in its final position.